For those who couldn't attend the AGM we have reproduced the presentation in The Warrior, however because of space constraints we could not reproduce the tables at a size where they are easily legible. With this in mind we have uploaded a pdf of the presentation so that you can see the amount of work that goes into the areas of Budgeting, Project Control, Risk Management, etc. and that a system is now in place to inform exactly where the build stands. These will be updated on a regular basis.

Click here to download.

MEMBERS’ MONTHLY BULLETIN - September 2021

 

Engineering 

Resource for progress at West Shed continues to be restricted by the overhaul of 6233. This was intended to be complete by the end of September, but is now expected in mid-October. 

Work on 5551 in the month has concentrated on the successful removal of various components from the frames (such as the inside cylinder and motion bracket), in preparation for refitting to the standard required. 

LMS Patriot Project Annual General Meeting

The above event will take place in Kidderminster Railway Museum which is located to the right of the ticket barrier at the Severn Valley Railway's Kidderminster station. Sat nav ref Comberton Hill DY10 1QX.

After the business part of the AGM is over, there will be a special presentation on the status of the project and an opportunity for members to discuss any aspects of the Company's business.

Please note this is a member's only event, but new membership can be obtained on the day.

The LMS Patriot Sales stall will be open in the museum on the day.

Great Central Railway Autumn Gala, Loughborough Railway Station

The LMS Patriot Project will have its sales stall open on the platform of Loughborough Railway Station throughout this event.

Come over to say hello and see us for latest progress on the project and buy your 2022 calendars among the many other things we are selling on our stall.

Engineering Update - August 2021

Work on The Unknown Warrior has continued at a limited pace since the last report.

 

MEMBERS' MONTHLY BULLETIN - August 2021

Engineering

An independent competent review has supported our decision to replace the driving wheels rather than attempting repair.

Our driving wheels are now at Boro Foundry for examination: we and the Foundry are cooperating on the provision of information about the engineering history of the wheels to establsih the cause of the defects.

The PRCLT chassis assessment was reviewed in August.  Issues were agreed with the preparation of frame surfaces for the attachment of components and the fixings used. There is more on this in The Warrior: we are finalising the detail of the remedial work with PRCLT and have started work on the forward programme implications.

MEMBERS’ MONTHLY BULLETIN JULY 2021

Engineering 

A full report on the driving wheels defects reported last month was submitted to our quarterly Trustee Board meeting on 31st July (our first face-to-face board meeting since January 2020).  The Board accepted the evidence which showed that the wheels will have to be replaced, and gave guidance on the way forward for the project.  

Chassis Update Video

Our Chassis Update Video is now available on our YouTube channel, thanks to Andrew Kennedy of Oakwood Visuals who recently filmed this at West Shed. Please Like, Subscribe to our channel or Comment.

MEMBERS MONTHLY BULLETIN, JUNE 2021

Engineering 

The major news this month concerns our driving wheels. We reported last month that they had to be tested after defects had been found in one wheel. The shot-blasting required for testing purposes was completed around the end of May, and the inspection itself was completed on June 14th.

The inspection was carried out by British Engineering Services (BES), using magnetic particle testing (MPI). Three members of our team attended at Riley and Son to witness the testing, joined by a senior representative from Boro Foundry who cast the wheels in 2010/11.   

We have just received the formal BES report, which confirms that all the five wheels tested have widespread serious cracking. 

MEMBERS MONTHLY BULLETIN, MAY 2021

Engineering

Work at West Shed continues to be limited by PRCLT’s need to allocate resources to 6233’s overhaul. However the left hand side expansion link has been successfully fitted and the inside expansion link has been removed for assessment.

There is no progress yet on the testing of the driving wheels reported in last month’s bulletin. The wheels have to be shot-blasted before the testing can be carried out and we are liaising actively with Riley and Son to get this done.

We do however have some better news: we have found an alternative supplier for the new axle material we need this year - the prospect of an 18-month wait has receded.

Pages

Subscribe to The LMS-Patriot Project RSS
The LMS-Patriot Company Ltd. • Civic Centre, Riverside, Stafford, ST16 3AQ
Registered in England & Wales No. 6502248 • Registered Charity No. 1123521
Tel 01785 244156
All content copyright ©2025 The LMS-Patriot Company Ltd.
website by amber
Follow us Facebook link